External scaffold ringlock steel galvanized for wall
Product Description of external scaffold ringlock steel galvanized for wall.
The ring lock scaffold is mainly composed of vertical rod(vertical posts), horizontal rod(horizontal ledger)and bay braces(Diagonal rod).
Materials | Diameter mm | Thickness mm | Length mm | |
Vertical rod | Q235B | 48 or 60 | 3.25 | 200-3000 |
horizontal ledger | Q235 | 48 or 60 | 2.75 | 300-1800 |
diagonal rod | Q195 | 42 | 2.75 | 1600-3000 |
Bottom support and upper support | Q235B | 48 or 38 | 20# | 500-600 |
Horizontal rod(horizontal ledger):
The materials of tubs is Q235,and the diameter of tubs is 48mm or 60mm.The thickness of tubs is 2.75mm.Also we can produce it as clients requirements.
The length of the tubs is generally between 0.3M and 31.8m.Also we can produce it as clients requirements.
There are locks at both ends of Horizontal rod(horizontal ledger).The locks is is cast by mould and with bolt.
Diagonal rod:
The materials of tubs is Q195,and the diameter of tubs is 42mm.The thickness of tubs is 2.75mm.Also we can produce it as clients requirements.
Vertical rod:
The materials of tubs is Q235B,and the diameter of tubs is 48mm or 60mm.The thickness of tubs is 3.25mm.Also we can produce it as clients requirements.
The length of the tubs is generally between 0.2 M and 3 m.Also we can produce it as clients requirements. Then some discs are welding on the tubs.The spacing of the disc is 0.5m or 0.6m.
It can transfer the self weight of scaffold,construction load and wind load.
Bottom support and upper support:
The materials of steel rod is Q235B,and the diameter of tubs is 48mm or 38mm..Also we can produce it as clients requirements.
About my company:
We are Renqiu Chongyou International Trade Co., Ltd. Our company is a subsidiary of haozheng Construction Equipment Co., Ltd. we have our own factory and independent export right. We are mainly engaged in the export of various steel products. We can provide you with various high-quality steel products, such as steel belt, round steel, flat steel, scaffolding, angle steel, etc. We are eager to cooperate with you for the first time.
Q: Are you trading company or manufacturer ?
A: We are trading companies and we have our own factoriesQ: How long is your delivery time?
A:Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shipment.If you have another question, please feel free to contact us as below