High Quality Mobile Aluminum Ladder Scaffolding Tower for Construction

High Quality Mobile Aluminum Ladder Scaffold Tower For BuildingOur new projects: Product parameters: Certificate TUV Materialaluminum alloy 6082-T6Dimension                 single width: 750*2000mm / 750*2500mm / 75

Featured Products

High Quality Mobile Aluminum Ladder Scaffold Tower For Building

Our new projects:
 
High Quality Mobile Aluminum Ladder Scaffold Tower for Building

Product parameters:
 
Certificate TUV 
Materialaluminum alloy 6082-T6
Dimension                 single width: 750*2000mm / 750*2500mm / 750*3000mm /                               
     double width: 1350*2000mm / 1350*2500mm / 1350*3000mm
Main tubeΦ51*2mm
Platform load272kg
Price term

EXW,FOB,CIF

Payment termT/T,Western Union,Trade Assurance 
Packing detail air bubble film / woven bag
Order lead time

usually 7-15 working days


Drawings of differenct kinds scaffolding:
High Quality Mobile Aluminum Ladder Scaffold Tower for Building


A.  Scaffolding with normal climb ladder at side

a)  1.35x2m,1.35x2.5m Aluminum Double Width Climb Ladder Scaffolding:
* Aluminum climb ladder scaffolding accords with Europe safety standard EN1004 completely. 
*Work platform can be fixed at any rung and interval height between two rung is 462mm. 
* It's a good choice for cleaning and repairing.
* It is flexible to assemble and dismantle, with strong stability.
 
b)  0.75x2m Aluminum Single Width Climb Ladder Scaffolding:
* The single width aluminum scaffolding its width is only 0.75m, so it can be used for limited space, such as narrow footpath and passageway.
* People can also push scaffolding go though the standard door. 
* It is easy to assemble and disassemble, stock and transport. 

B.  Scaffolding with inside stair scaffoldingSize 1.35x2m,1.35x2.5m available
  1. It is easier for workers to go up and down and carry tools.
  2. Aluminum alloy is light weight, non-rust, solid and durable.
  3. Vertical ladder structure helps to increase space for working and save assembling time.
  4. Platform can be fixed at different height of the scaffolding.
  5. Attached guardrail and toe board is to ensure safety of working conditions.
  6. A variety of accessories is available to meet different requirements of different projects
The components of scaffolding

High Quality Mobile Aluminum Ladder Scaffold Tower for Building

The details of aluminum scaffolding

Raw material

-aluminum 6082-T6

-wall thickness 2mm

-diameter 51mm

-full ripple tube

High Quality Mobile Aluminum Ladder Scaffold Tower for Building

Wheel & adjustable leg
 

-great load capacity, 6'' wheel--600kg, 8'' wheel--800kg

-2 switches, brake & release, the wheel won't rotate when braking

High Quality Mobile Aluminum Ladder Scaffold Tower for Building

 

Scaffolding platform

-black laminated plywood deck (or aluminum alloy deck)

-strong load capacity, 272 kg / platform

-aliminum alloy frame

-anti slippery

High Quality Mobile Aluminum Ladder Scaffold Tower for Building


Quality inspection before delivery
High Quality Mobile Aluminum Ladder Scaffold Tower for Building

TUV certification
High Quality Mobile Aluminum Ladder Scaffold Tower for Building

Sucessful case

High Quality Mobile Aluminum Ladder Scaffold Tower for Building

Scaffolding advantages


1. It is easier for workers to go up and down and carry tools.
2. Aluminum alloy is light weight, non-rust, solid and durable.
3. Vertical ladder structure helps to increase space for working and save assembling time.
4. Platform can be fixed at different height of the scaffolding.
5. Attached guardrail and toe board is to ensure safety of working conditions.
6. A variety of accessories is available to meet different requirements of different projects
7. Scaffolding quality guarantee 3 years! 


Packing & delivery

-air bubble film plus woven bag for LCL goods
-air bubble film for FCL goods


High Quality Mobile Aluminum Ladder Scaffold Tower for Building

Company information
High Quality Mobile Aluminum Ladder Scaffold Tower for Building
High Quality Mobile Aluminum Ladder Scaffold Tower for Building

FAQ


1. Q: What certificate do Kenzo Event have?   
     A: TUV certification.
2. Q: What is the terms of payment?    
     A: We accept Western Union, by T/T, 30% of invoice value as deposit, 70% balance paid before shipment, and some others.
3. Q: Where is the loading port?    
     A: Ports in Guangzhou or Ports in Shenzhen.
4. Q: How does your factory do regarding quality control?  
     A: We control products quality under the instruction of national standards.
5. Q: What is your packaging?    
     A: Air bubble film or carton or flight case.
6. Q: How long the deliver time?    
     A: General it is about 10-15 days.
7. Q: Does Kenzo Event accept OEM order?    
     A: Yes, we welcome OEM order as well.
8. Q: Does Kenzo Event accept customized logo order?   
     A: Yes, we can make logo on the product for clients.


How to contact us?

Send your Inquiry Details in the Below, Click "Send" Now!!!

 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours