Efficient and Advanced Self-Climbing Scaffolding

High efficiency Advanced Automatic Climbing Scaffolding NameUnitStandard valueNote.Frame height\\4-5 level of the floor\\Frame widthm0.6-1.2Distance with the mainframe support and the buildingSupport spanm≤6.0Curve or broken distance≤5.4Length of cantileverm<2m,And shall not be more than 1/2 support span/Average sp

Featured Products

High efficiency Advanced Automatic Climbing Scaffolding High Efficiency Advanced Automatic Climbing ScaffoldingHigh Efficiency Advanced Automatic Climbing Scaffolding
Name
Unit
Standard value
Note.
Frame height
\
4-5 level of the floor
\
Frame width
m
0.6-1.2
Distance with the mainframe support and the building
Support span
m
≤6.0
Curve or broken distance≤5.4
Length of cantilever
m
<2m,And shall not be more than 1/2 support span
/
Average space between each hoist position
m
4~5
/
The vertical spacing of the frame
m
2
/
Anti-fall device
/
No less than one in any condition
The 24/7 process works with the concept of non-falling
The minimum frame distance to the wall
mm
≤200
/
Frame weight
t/m
0.6-0.7 tons per extension meter
Each extension meter along the horizontal peri-perith
The rate of the electric hoist
t
7.5
/
Climbing speed
mm/min
120-130
/
Electric hoist motor power
Kw
0.5
Single motor power
Time for raise a floor
h
Normally 0.5
Each set
The lift control of the frame
/
Remote control
One main control, and hand on per person
The frame simultaneously lifts the load control
/
Over or less than 30% of the fault point,it will alarm and an automatic shutdown
/
Deviation allow for the pre-buried hold
mm
±50
/
The carrying capacity of the operating layer
KN/square metre
Two simultaneous: 3.0;
Three simultaneous: 2.0
/
High Efficiency Advanced Automatic Climbing ScaffoldingHigh Efficiency Advanced Automatic Climbing ScaffoldingHigh Efficiency Advanced Automatic Climbing ScaffoldingHigh Efficiency Advanced Automatic Climbing ScaffoldingHigh Efficiency Advanced Automatic Climbing ScaffoldingGuangdong Lingsheng Prefabricated Building Technology Co., Ltd. was founded in April 2018. Gold set as a professional service provider of prefabricated building, headquartered in the world famous manufacturing city Foshan, Guangdong.

LingChuang mold technology CO,.LTD is focused on climbing scaffold development, design, produce, and also provide service as sell, rent and being a sub-contractor. The manufacturing factory is located in Heshan industrial area, Jiangmen , Guangdong Province, with a registered capital of 158 million yuan. The factory covers an area of 100,000 square meters and the total construction area of 60,000 square meters.
High Efficiency Advanced Automatic Climbing ScaffoldingHigh Efficiency Advanced Automatic Climbing ScaffoldingHigh Efficiency Advanced Automatic Climbing ScaffoldingQ: Are you trading company or manufacturer?
A:We are direct factory with 60,4000 square meters.

Q: How long is your delivery time?
A: The delivery time is within 5-45 days after received the deposit, please contact us for more details.

Q: What is your terms of payment?
A: 30% T/T in advance + 70% balance before shipment, or LC at sight.

Q: Is your product only sold as a whole?
A: No, we also sell it in parts.

Q: What is your main market?
A: Our main markets are Domestic Market, Middle East, South-East Asia, Africa, European etc.

Q: Can you accept OEM or ODM?
A: Yes, we have the complete produce line, we accept OEM or ODM.

Q: Can you provide special customized solution for us?
A: Sure, customized service is available, that is one of our business. Please let us know your idea.

Q: Can we visit your factory?
A: Sure, feel free to contact us before your visit. If you have any another questions, please feel free to contact us.

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours