INTRODUCTION:
Kwikstage is a versatile modular scaffolding and formwork support system widely using in Australia. New Zealand, UK, Ireland, and the Middle East.
Kwikstage scaffold includes tube and fitting method, which is a brilliant alternative to conventional types Kwikstage components vary depending on the region you are operating in. Such as in the UK, you have the component called return transom, but in Australia, they don't have this item.
Our products are designed to meet strict safety standards AS1576.1 and are well tested proven in the industry.
TABLE OF PRODUCTS PARAMETERS:
Place of Origin | China |
Brand Name | HDRL |
Size of Angle | 230*63.5*1.8mm |
Material Standard | Pre-galvanized steel |
Surface Treatment | hot dipped galvanization or painted |
Packaging Detail | steel pallet, or packed in bundle |
Delivery Detail | 20-30 days after deposit. |
Basic Components | vertical standard, ledger, diagonal brace, transom, bracket, tie bar, ladder beam, base jack, steel plank, toe board bracket, end toe board bracket. aluminum stairs, handrail. |
manufacturing | OEM&ODM |
Ringlock VERTICAL STANDARD:
Item No. | Description | Size | Weight (kgs) |
KP24 | Steel Plank 2.4m | 2400mm | 14.60 |
KP18 | Steel Plank 1.8m | 1800mm | 11.60 |
KP12 | Steel Plank 1.2m | 1200mm | 8.00 |
KP07 | Steel Plank 0.7m | 700mm | 5.00 |
FACTORY PHOTOS:
PRODUCTS PHOTOS:
PRODUCTION PROCESS
CERTIFICATION
CUSTOMER VISITING
Q1: Are you a factory or trading company?
A: We are a factory specializing in manufacturing all kinds of scaffolding material.
Q2: Where is the loading port?
A: Qingdao port or Tianjin port
Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one pallet is preferred.
Q4: What certificates do you have?
A: We have ISO 9001, ISO 14001, CE, SGS, and TUV certification.
Q5: Can I get some samples?
A: Yes, Sample is free, but usually the customer will pay for the shipping cost.
Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.
Q7: How long is the production cycle after ordering?
A: General it is about 20-30 days.
Q8: What is the payment methods?
A: T/T payment is preferred and other payment terms is accepted.